1) kekerasan dhuwur.
2) Superior resistance abrasion.
3) Karat lan resistance kimia.
4) Bobot entheng.
5) Bisa vulcanized ing kabeh jinis panel karet utawa conveyor.
Industri | Sistem peralatan | bagean peralatan |
semen | Sistem pra-campuran kanggo nabrak kapur lan bahan bakar mentah | Chute, bunker, pulley lagging, discharge cone |
Sistem pabrik mentah | Feed chute, retaining ring, scraper plate, seal ring, pipeline, bucket guard, cyclone, powder concentrator body, bunker | |
Sistem pabrik semen | Chute, bunker, roda baling-baling kipas, casing kipas, siklon, saluran bunder, conveyer | |
Sistem ball mill | Awak knalpot pulverizer lan roda baling-baling, awak konsentrator bubuk, pipa batubara bubuk, saluran udara panas | |
Sistem sintering | Inlet/outlet bend, wind value plate, cyclone, chute, pipa kolektor debu | |
Sistem afterheat | Pipa separator lan tembok | |
baja | Sistem pakan bahan mentah | Hopper, silo |
Sistem Batching | Nyawiji bunker, nyawiji tong minyak, nyawiji disk, disk pelletizer | |
Sistem transportasi bahan sintered | Hopper, silo | |
Sistem Dedusting lan Ash discharge | Pipa dedusting, bend, y-piece | |
Sistem coking | Coke hopper | |
Pabrik kacepetan medium | Kerucut, buffle pemisah, pipa outlet, pipa batubara bubuk, kerucut pembakar | |
gilingan bal | Klasifikasi, pemisah siklon, bend, cangkang jero konsentrator bubuk | |
Daya termal | Sistem penanganan batubara | Mesin roda ember, hopper batubara, feeder batubara, orifice |
Sistem ball mill | Pipa pemisah, siku lan kerucut, siku pabrik batu bara lan tabung lurus | |
Pabrik kacepetan medium | badan pabrik batu bara, buffles pamisahan, conthong, pipa, sikut | |
Pabrik tiba | Pipa lan sikut batubara sing digiling | |
Sistem dedusting | Pipa lan sikut Dedusting | |
Sistem pembuangan abu | Cangkang kipas, pipa | |
Pelabuhan | Sistem transportasi bahan | Disk lan hopper mesin roda ember, hopper titik transfer, hopper unloader, |
Peleburan | Sistem transportasi bahan | Measuring hopper, coke hopper, vibrating screen's chute, head valve, Intermediate bin, tail bin |
Sistem Batching | batch hopper, nyawiji mesin | |
Sistem pembakaran | Ember awu, tabung kalsin pompa, hopper | |
Sistem dedusting | Pipa lan sikut Dedusting | |
Kimia | Sistem transportasi bahan | Hopper, silo |
Sistem dedusting | Pipa lan sikut Dedusting | |
peralatan pangolahan | Vibromill liner | |
Batu bara | Sistem penanganan batubara | Mesin roda ember, hopper batubara, feeder batubara |
Sistem cuci batu bara | Hidrosiklon | |
pertambangan | Sistem transportasi bahan | Hopper, silo |
S. Ora. | Atribut | Unit | CHEMSHUN 92 I | CHEMSHUN92 II | CHEMSHUN 95 | CHEMSHUN ZTA |
1 | Kandungan alumina | % | 92 | 92 | 95 | 70-75 |
ZrO2 | % | 25-30 | ||||
2 | Kapadhetan | g/cc | ≥3.60 | ≥3.60 | > 3.65 | ≥4.2 |
3 | warna | - | Putih | Putih | Putih | Putih |
4 | Penyerapan banyu | % | <0.01 | <0.01 | 0 | 0 |
5 | Kekuatan lentur | Mpa | 270 | 300 | 320 | 680 |
6 | Kapadhetan Moh | sasmita | 9 | 9 | 9 | 9 |
7 | Kekerasan Sumur Batu | HRA | 80 | 85 | 87 | 90 |
8 | Kekerasan Vickers (HV5) | Kg/mm2 | 1000 | 1150 | 1200 | 1300 |
9 | Ketangguhan Patah (Min) | MPa.m1/2 | 1000 | 3-4 | 3-4 | 4-5 |
10 | Kekuwatan kompresif | Mpa | 850 | 850 | 870 | 1500 |
11 | Koefisien Ekspansi Termal (25-1000ºC) | 1×10-6/ºC | 8 | 7.6 | 8.1 | 8.3 |
12 | Suhu operasi maksimum | ºC | 1450 | 1450 | 1500 | 1500 |
1) Tim teknis profesional kanggo menehi desain CAD.
2) Tim instalasi profesional kanggo mbayar layanan instalasi.
3) Proses sing mapan miturut standar internasional.
4) Nampa kothak standar lan wis direkayasa.